Actually I talked about the MAX. Not a specific version. Both the "ordinary", and the redundant power supply versions have a limit of supporting up to 72 modems per chassis. The point of redundancy is that a failure of one supply should not adversely effect the "system" - which it would if we allowed more than 72 modems: one supply fails -> second supply cannot handle the load -> power failure -> no redundancy. Kevin Smith Updated Service and Support Ascend Communications Resources are now at: <A HREF="http://www.ascend.com/service">http://www.ascend.com/service</A> ++ Ascend Users Mailing List ++ To unsubscribe: send unsubscribe to ascend-users-request@bungi.com To get FAQ'd: <<A HREF="http://www.shore.net/~dreaming/ascend-faq">http://www.shore.net/~dreaming/ascend-faq</A>> or <<A HREF="ftp://ftp.shore.net/members/dreaming/ascend-faq.txt">ftp://ftp.shore.net/members/dreaming/ascend-faq.txt</A>> </PRE> <!--X-MsgBody-End--> <!--X-Follow-Ups--> <!--X-Follow-Ups-End--> <!--X-References--> <!--X-References-End--> <!--X-BotPNI--> <HR> <UL> <LI>Prev by Date: <STRONG><A HREF="msg00825.html">(ASCEND) Radius compilation error.</A></STRONG> </LI> <LI>Next by Date: <STRONG><A HREF="msg00830.html">(ASCEND) 5.0Ai13</A></STRONG> </LI> <LI>Prev by thread: <STRONG><A HREF="msg00448.html">RE: (ASCEND) 96 Modems in a MAX</A></STRONG> </LI> <LI>Next by thread: <STRONG><A HREF="msg00444.html">Re: (ASCEND) Erols PBX "Policy" Accurate!!!</A></STRONG> </LI> <LI>Index(es): <UL> <LI><A HREF="maillist.html#00831"><STRONG>Main</STRONG></A></LI> <LI><A HREF="thrd18.html#00831"><STRONG>Thread</STRONG></A></LI> </UL> </LI> </UL> <!--X-BotPNI-End--> <!--X-User-Footer--> <!--X-User-Footer-End--> </BODY> </HTML>